A business that moved from an on-premises ERP to Dynamics 365 gave up one thing it rarely notices until the first surprise: control of the calendar. The old system changed when the business chose to upgrade it, which was often never. The cloud product changes on Microsoft's schedule.
Microsoft's service update documentation for the finance and operations apps sets out the rhythm. There are four service updates a year. A customer can pause one, and must take at least two of them. The update reaches a sandbox environment before it reaches production, so there is a window, measured in days, to find problems first. The details change from time to time, and the linked page is the one to check.
None of that is a difficulty in itself. Updates are how the product is kept secure and current. The difficulty is that in many mid-sized businesses the window opens and closes with nobody assigned to use it.
Why it falls between people
The implementation partner finished the project and moved on. The internal administrator, if there is one, handles users and month-end. Finance assumes IT tests updates. IT assumes Microsoft tested them. Microsoft did, against the standard product. What Microsoft cannot test is the part that belongs to one business: its customisations, its integrations, its Power Automate flows and the reports that feed its month-end.
So the update lands, and the first test is a live transaction. Usually nothing happens. Now and then an integration that depended on a field or a behaviour stops, and it is discovered at the worst hour, such as the last day of the month.
What actually needs testing
Not everything. A full regression of an ERP four times a year is beyond most mid-sized teams, and it is not needed. The risk sits in a short list.
- Integrations. Every feed in and out: the web store, the warehouse system, the bank file, the EDI network, the payroll export. One real message each way.
- Customisations and extensions. Anything built for this business or installed from a third party. Open each screen and complete its main transaction.
- Automated flows. Approvals, notifications and scheduled jobs. A flow built by someone who has left is the classic silent failure, because it stops without an error anyone is watching for.
- The critical path. A sales order from entry to invoice, a purchase order from entry to payment, and the month-end steps finance cannot miss.
- The reports people sign. The handful that go to the board, the bank or the auditor.
Written down once, that list is perhaps twenty to forty scripts. It is a day of work for someone who knows the system, not a project.
A routine that fits the rhythm
- Put the dates in a calendar. When each update reaches the sandbox, when it reaches production, and which one the business intends to pause, if any.
- Read the release notes for what touches the list. Most of each release does not concern a given business. The part that mentions a module in use, or a feature being retired, does.
- Run the scripts in the sandbox as soon as the update arrives there, with data recent enough to be realistic.
- Record pass or fail for each script, with a screenshot. A failure goes to whoever owns that integration or extension, with the production date beside it.
- Decide before the production date: take it, or use the pause. The pause is for a known failure that needs time to fix, and it should not be spent on a quarter when nobody had time to look.
The routine also produces something auditors like: a dated record that changes to the financial system were tested before they went live.
Who should own it
Someone named, with the hours set aside four times a year. It can be an internal administrator, provided the scripts exist and month-end does not always win. It can be the original partner, if the support agreement says so in words. Many do not. It can be a managed service, where update testing is a line in the schedule with a report after each one.
The test of any of the three is the same question, asked before the next update: who ran the scripts last time, and where is the record? If there is no answer, the business is testing in production. It simply has not been unlucky yet.
Quantonic's Dynamics 365 service includes update readiness through one queue and a monthly report. The Dynamics 365 page says what is covered and who delivers it, and what a managed service schedule should say lists what to ask for in writing.