A supplier wins a ranging with a major retailer and is told it must trade by EDI. Somewhere in the onboarding pack is a step called accreditation, or testing, or approval to trade. Until it is passed, no real purchase order will arrive. Suppliers tend to learn what this step involves by going through it once. This is a description of it in advance.
What accreditation is
It is the retailer proving to itself that a supplier's documents will work in its systems before any stock depends on them. The retailer, or a testing service acting for it, sends test documents and inspects what comes back. Each document has to be correct in structure, which is the format the guide specifies, and correct in content, which is whether the numbers and codes are ones the retailer recognises.
Public reporting on one Australian supermarket's process gives a fair picture of the scope. A 2023 article in Food and Drink Business describes end-to-end testing of purchase orders, order responses and changes, advance ship notices and invoices, and says the process had taken weeks or months before a self-service testing tool cut it to days. Other retailers run their own versions. The documents are much the same.
The four documents, in order
The purchase order. The retailer sends a test order. The supplier's system has to receive it, read it and create a sales order without a person retyping anything. This is where product and location data are first tested: the retailer's item numbers and store or warehouse identifiers have to match records in the supplier's ERP.
The order response. The supplier confirms what it will ship. Tests usually include the awkward cases on purpose: a short supply, a substituted item, a changed delivery date, a rejected line. A supplier whose system can only say yes to everything will stall here.
The advance ship notice. The hardest of the four for most suppliers. It describes the physical shipment: which cartons, on which pallets, carrying which items in which quantities, each with a label the retailer's warehouse will scan. The document and the labels have to agree with each other and with what is actually on the truck. What an ASN rejection means goes through the common faults.
The invoice. It has to match the order and the receipt: same items, same quantities, same prices, with tax shown the way the guide asks. Price mismatches found here usually began in the price file months earlier.
Where the weeks go
Rarely on the testing itself. A clean supplier can pass each document in a day. The time goes on three things.
- Waiting. Each failed test goes back into a queue on the retailer's side. If the retailer's team reviews results twice a week, every failure costs days.
- Data that was never needed before. Pack sizes, carton dimensions, barcodes at each packaging level, and location numbers. A business that has only ever sold by email may not hold these in its ERP at all.
- Three parties. The supplier, its EDI network or software provider, and the retailer. A failure has to be traced to one of them before anyone fixes it, and each can reasonably believe it is another's.
What to have ready before the first test
- The retailer's guide, read in full. Which documents, which fields are mandatory, and the rules on timing. Someone in the supplier's business should be able to answer questions about it without opening it.
- Item data that matches. For every ranged product: the retailer's item number, the barcode at unit, inner and carton level, and the pack quantities, checked against the physical product.
- Location identifiers. The retailer's ship-to points and the supplier's own, set up in the ERP as the guide names them.
- A label that scans. Print a real logistics label from the real system and scan it. Many accreditation delays are a printer or a label layout.
- A named person on each side. One at the supplier, one at the network or software provider, with an agreed way to hand a failure between them.
After the pass
Accreditation proves that a set of test cases worked on the day. It does not prove the process will hold when a new product is ranged, a pack size changes or a warehouse is added. The same data that was checked by hand for the test has to be maintained for every item afterwards, by someone who knows that an EDI document depends on it.
It is also worth asking the retailer one question before finishing: what happens if the supplier changes its ERP or its EDI provider? Some ask for testing again. Better to know that before the next system project is planned than during it.
Quantonic's ERP and EDI work includes taking a supplier through a retailer's testing. The ERP and EDI page sets out the ways to start.
Comments & Discussion
No comments yet. Be the first to share your thoughts!
Leave a Comment
Please sign in to leave a comment.