An ERP upgrade or migration has a date on a calendar and a plan with many names on it. The vendor owns the software and the implementation partner owns the configuration. The project manager owns the plan. Finance owns the chart of accounts and watches it closely. Two jobs tend to have no name beside them: the product and price data that will be carried across, and the test scripts that prove the new system does what the old one did. Both are assumed to belong to someone else. Both decide whether go-live holds.
The numbers agree. In Panorama Consulting Group's 2024 ERP Report, about a third of the surveyed projects ran over budget and about a third ran late. Data issues were among the reasons given by roughly a third of the over-budget projects and nearly half of the late ones. The sample is small, 131 organisations, most of them in North America, but the pattern is familiar.
Why the data has no owner
The partner's contract usually says the business will supply clean data in the partner's template. The business reads that as a formatting task and hands it to whoever knows spreadsheets. But the data in an old ERP is not clean, and nobody in the project is charged with deciding what clean means.
Product data collects years of exceptions. Units of measure that were entered differently by different people. Pack sizes that match a carton nobody ships any more. Discontinued items still linked to live price lists. Supplier and customer cross-references that exist in the old system as a custom table the new one does not have. Location codes that trading partners identify by GLN, the thirteen-digit number behind every ship-to point in an EDI message. Every one of these is a business decision, not a technical one: keep it, fix it or leave it behind.
When no one is named, the decisions are made by default in the week before the data load, by the person filling in the template.
What the data owner does
The job is specific and can be written on one page.
- Decide what migrates. Active items, open orders and current prices are easy. The rule for inactive items, history and old price lists needs to be written down and signed.
- Map every field that has no home. List each field and custom table in the old system that the new one does not have, and state where its content goes or why it is dropped.
- Rehearse the load. Microsoft's implementation guidance for Dynamics 365 says to run the migration at least once in a test environment before the real one. The same holds for any ERP.
- Reconcile, in numbers. Counts and totals before and after each trial load: item count, price records, stock value, open order lines. A load that matches on counts and differs on value has a unit-of-measure problem.
- Own the cutover load. The same person who ran the trial loads runs the real one, from the same checklist.
This person needs authority to ask merchandising, purchasing and the warehouse for decisions, and enough time. Plan for a real allocation, often a day a week or more for the length of the project.
Why testing has no owner
The partner tests that the software works as configured. That is not the same as testing that the business can trade. User acceptance testing is the business's job. Microsoft's guidance on acceptance testing after migration puts it with business users, working from scenarios that mimic real use, and ends it with a formal sign-off. In practice it is commonly reduced to a week near the end in which busy people click through screens with no script. Problems found then are found too late to fix before the date.
The gap is widest at the edges of the ERP. The integrations to the web store, the warehouse system, the reporting layer and the EDI network are each owned by a different vendor. Each vendor tests its own side. Nobody tests the whole path from a retailer's purchase order to the invoice that pays for it.
What the test owner does
- Write scenarios from real days. Take last month's actual orders, price changes and returns, including the awkward ones, and write each as a script with an expected result.
- Test end to end. An order arrives, is picked and shipped, the advance ship notice goes out, the invoice follows, and every document that leaves the building is checked against what the trading partner accepts today.
- Record every result. Pass, fail, or blocked, with evidence. A failed script names who must fix it.
- Hold the gate. The agreed list of scripts that must pass before go-live, decided at the start, not negotiated on the last Friday.
For a supplier trading by EDI, one more step belongs here. Some retailers ask for documents to be tested again after a supplier changes system, and retailer testing runs on the retailer's calendar, not the project's. Ask each major trading partner early what a system change requires of a supplier.
Assigning the two jobs
They can be one person or two. They can be internal or brought in. What matters is that each has a name on the project plan from the first month, with hours beside it. A useful check at kickoff is to ask two questions aloud: who signs that the data is right, and who signs that the tests have passed? If the answer to either is the partner, read the partner's contract again. It usually says otherwise.
Data and test ownership through an ERP change is part of Quantonic's ERP and EDI work. The ERP and EDI page sets out the ways to start, and why product master data breaks EDI covers the data side in more detail.